EXTENTION OF REHAB POWER PLANT 100MW(JORDAN)

p1 p3   p4


Gaza Power Plant (140MW PALESTINE):

p5 p2

 

 

EXTENSION OF REHAB SUBSTATION

6 7   8

 

 

Project Execution in Jordan
PROJECT NAME
LOCATION
SCOPE OF WORK

Jordan Bromine Petra Expansion Project. 33kV Overhead line.
Contract Agreement # 12053

JORDAN

Design, Supply, installation, testing and commissioning of new 33kV power supply line from 132/33kV substation (NEPCO S/S) at Arab Potash Co. facilities to Jordan Bromine Co. Plant’s site.

Jordan Bromine Petra Expansion Project. Perimeter Lightning and Cable Installations.
Contract Agreement # 56361:EL004

JORDAN

Supply and installation of 66 lightning poles with flood light, and installation of cables, rod, lightning fittings, junction box and all accessories.

 

Project Under Execution in Qatar

 

PROJECT NAME
LOCATION
SCOPE OF WORK

Main contractor – Larson & Toubro (LNT)

Contract No: CP 361/01

 

 

 

 

QATAR

 

 

 

 

Doha South Sewage Treatment Plant

  • Installation of Cable raceway system.
  • Installation of Power and control cable System.
  • Installation of earthing Grid.
  • Installation of different types of lighting poles.
  • Installation of different MVDB, LVAC, LVDC…. ETC
  • Installation of Lighting System  
  • Fabrication And Installation of steel structure Supports.
  • Installation Of complete Conduit System
     
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

 

 

 

QATAR

 

 

 

 

66/11kV GHARAFA NORTH (UPGRADE)

  • Installation of 66 kV GIS.
  • Installation of protection systems for 66kV.
  • Installation of protection systems for 66kV.
  • Installation of 11 kV Swgr.
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination.
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC.
  • Pulling ,Installation, Testing & Commissioning Of 11 KV
    Cables including Glanding And Termination.
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

 

 

 

 

QATAR

 

 

 

 

66/11kV BIN MAHMOUD  S/S

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting system
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable support
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC.
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

QATAR

66/11kV MINISTRY OF INTERIOR  S/S

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS.
  • Installation of protection systems for 66kV.
  • Installation of 11 kV Swgr.
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cable Trays
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC and control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

QATAR

66/11kV DOHA INDUSTRIAL F  S/S

  • Installation of 66 kV GIS
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

QATAR

66/11kV SHERATON PARK   S/S (UNDERGROUND)

  • Installation of 66 kV GIS
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

 

QATAR

132/11kV AL KHISSA WEST UPGRADE   S/S

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC

PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

 

 

QATAR

66/11kV VEGETABLE MARKET   S/S

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

 

 

QATAR

66/11kV UMM AL GHAHAB   S/S (REPLACEMENT

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

 

 

QATAR

66/11kV AL WAJBAH SOUTH S/S

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

 

 

QATAR

132/11kV ABU SIDRA UPGRADE  S/S

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

 

 

QATAR

132/11kV PSS-3 S/S

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 371(B+D) 2010

Main contractor – SIEMENS W.L.L.

 

 

 

QATAR

66/11kV DOHA INDUSTRIAL C  S/S

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cable Trays
  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC/371A/2010

MAIN CONTRACTO  – LARSON & TOUBRO (LNT)

 

 

 

 

QATAR

132/11kV BARAZAN CAMP 1 S/S. (AMIRI GUARD)

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Small Power works:
    • Installation of All light fittings and lighting poles

    • Installation of Conduits and saddle clamps

    • Installation of BDPs,Sockets,…etc

  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC/371A/2010

MAIN CONTRACTO  – LARSON & TOUBRO (LNT)

.

 

 

 

QATAR

132/11kV BARAZAN CAMP 2 S/S. (AMIRI GUARD)

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Small Power works:
    • Installation of All light fittings and lighting poles

    • Installation of Conduits and saddle clamps

    • Installation of BDPs,Sockets,…etc

  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC/371A/2010

MAIN CONTRACTO  – LARSON & TOUBRO (LNT)

 

 

 

 

QATAR

132/11kV AL RUAIS  S/S. (AMIRI GUARD)

  • Installation of 66 kV GIS.
  • Installation of LCC for 66 kV GIS
  • Installation of protection systems for 66kV
  • Installation of 11 kV Swgr
  • Installation of protection system for 11kv
  • Installation of 40 MVA power transformers complete with oil filtration process
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Small Power works:
    • Installation of All light fittings and lighting poles

    • Installation of Conduits and saddle clamps

    • Installation of BDPs,Sockets,…etc

  • Installation of LV Cables including glanding and termination
  • Supply and installation of 11kv and 66 kv cable supports
  • Supply and installation of base frame support for LCC And control Relay Panels,LVAC,DCDB,BC,SCS…ETC
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 240A 2008

Main contractor – SIEMENS Ltd.

PERCENT OF EXECUTION = 90%

 

 

 

 

QATAR

400 KV GIS S/S LOGISTIC ZONE SUPER - GCC INTERFACE SUBSTATION

  • Installation of 400 KV GIS with double Bus bar
  • Installation of 125 MVAR Shunt Reactor complete with oil filtration process
  • Installation of  Outdoor Equipment like
    • 400kV Surge Arrester along with support structures
    • 400kV Capacitive Voltage Transformer along with support structures
    • 2000A Wave trap
    • Line Coupling Unit
    • Outdoor Primary Connections between GIS and OHL terminated on OHL gantries
    • Post tube insulators
    • Insulator strings, including hardware
  • Installation of protection system for 400 kV
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Modification Works at Remote Ends
PROJECT NAME
LOCATION
SCOPE OF WORK

GTC 240A 2008

Main contractor – SIEMENS Ltd.

PERCENT OF EXECUTION = 90%

 

 

 

 

QATAR

400 KV GIS S/S LOGISTIC ZONE SUPER - KM SUBSTATION

  • Installation of 400 KV GIS with double Busbar
  • Installation of 125 MVAR Shunt Reactor complete with oil filtration process
  • Installation of  400 KV Surge Arrestor
  • Installation of protection system for 400 kV
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Modification Works at Remote Ends

 

 

EMC Completed Projects

 

PROJECT NAME
LOCATION
SCOPE OF WORK

KAHRAMMA  GTC123/2006

Main Contractor – SIEMENS

PHASE VII

16 substations

 

 

 

 

 

QATAR

Installation works & assistance in commissioning for the following substations:

  MIC-3 (66/11kV) S/S

  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of protection system for 11kv
  • Installation of 11kV switchgear
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning

 MIC-2 (66/11kV)  S/S

  • Installation of 40MVA power transformer complete with oil filtration process
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning

NBK2 (66/11kV) S/S

  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

QRE (66/11kV) S/S

  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

AL- DHAHIYA WEST (66/11kV) S/S

  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

AL- DHAHIYA (132/66/11kV) S/S

  • Installation of 132 kV CIS.
  • Installation of LCC for 132kV GIS.
  • Installation of protection systems for 132kV.
  • Installation of 200MVA power transformer complete with oil filtration process
  • Installation of 160MVA power transformers complete
  • Installation of 66kV GIS.
  • Installation of LCC for 66kV GIS
  • Installation of protection system for 66kV
  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable  raceway, termination, tagging 
  • Installation of AVR for transformers

WAKRAH-2 (132/66/11kV) S/S

  • Installation of 132 kV CIS.
  • Installation of LCC for 132kV GIS.
  • Installation of protection systems for 132kV.
  • Installation of 200MVA power transformer complete with oil filtration process
  • Installation of 160MVA power transformers complete
  • Installation of 66kV GIS.
  • Installation of LCC for 66kV GIS
  • Installation of protection system for 66kV
  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

MURAIKH NORTH (66/11kV) S/S

  • Installation of 66kV GIS.
  • Installation of LCC for 66kV GIS
  • Installation of protection system for 66kV
  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

NDQ (66/11kV) S/S

  • Installation of 66kV GIS.
  • Installation of LCC for 66kV GIS
  • Installation of protection system for 66kV
  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

MOSEMEER (66/11kV) S/S

  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

ABUHAMOUR CENTRAL (66/11kV) S/S

  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

AL SUDAN (66/11kV) S/S

  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

KHORE JUNCTION (66/11kV) S/S

  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

AIN HAMAD SUBSTATION MODIFICATIONS

  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

AIN KHALID SOUTH (66/11kV) S/S

  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

AL WADI (66/11kV) S/S

  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

 

 

GTC/144C/2006 Qatar Power Transmission System

Package S-3-1

Main Contractor – LARSON & TOUBRO

PHASE VIII

 

 

 

 

 

 

QATAR

Installation works & assistance in commissioning for the following substations:

 

EDC-2 (66/11kV) S/S

  • Installation of 66kV GIS.
  • Installation of LCC for 66kV GIS
  • Installation of protection system for 66kV
  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.
  • Installation of lighting and small power systems

EDC-6 (66/11kV) S/S

    • Installation of 66kV GIS.
    • Installation of LCC for 66kV GIS
    • Installation of protection system for 66kV
    • Installation of 40MVA power transformer complete with oil filtration process.
    • Installation of 11kV switchgear
    • Installation of protection system for 11kv
    • Installation of SCS control systems
    • Installation of LV/AC/DC systems
    • Installation of earthing & lighting systems
    • Installation of cabling complete with cable raceway, termination, tagging 
    • Installation of AVR for transformers
    • Installation of lighting and small power systems

KAHRAMAA
Ras Laffan expansion Port S/S Extension 132/66/11kV GIS S/S

PHASE VI

Main Contractor - SIEMENS

 

 

QATAR
315MVA Transformer Installation, protection panel, etc…

KAHRAMAA
Umm Al-Regab S/S outdoor 66kV S/S

PHASE VII

Main Contractor - SIEMENS
QATAR

Out door equipment installation

KAHRAMAA
Umm Al-Regab S/S outdoor 66kV S/S PHASE VII Main Contractor - SIEMENS

QATAR
Out door equipment installation
SERVICES
DEBAJ Co.
QATAR
315 MVA Transformers oil filtration works & testing and commissioning services
CONSILIUM Qatar Co.
QATAR
Testing &commissioning services and oil filtration works
BEMCO
QATAR
Testing &commissioning services
PUNJOLLYED
QATAR
Testing &commissioning services
HYUNDAI  LTD
QATAR
40 MVA Transformers oil filtration works, testing and commissioning for 220kV GIS, other testing services
STATRON ME
QATAR
Testing &commissioning services
GULF CONSOLIDATED CONT.
QATAR
Transformers oil filtration works

 

PROJECT NAME
DURATION
LOCATION
SCOPE OF WORK

KAHRAMAA
GTC/5/2004

Main contractor - SIEMENS

 

 

 

 

14 months
QATAR

Installation works & assistance in commissioning for RAA SUPER S/S

  • The works for the above substation include the following activities:
  • Installation of 220kV CIS.
  • Installation of LCC for 220kV GIS.
  • Installation of protection systems for 220kV.
  • Installation of 200MVA power transformer complete with oil filtration process
  • Installation of 160MVA power transformers complete
  • Installation of 66kV GIS.
  • Installation of LCC for 66kV GIS
  • Installation of protection system for 66kV
  • Installation of 40MVA power transformer complete with oil filtration process.
  • Installation of 11kV switchgear
  • Installation of protection system for 11kv
  • Installation of SCS control systems
  • Installation of LV/AC/DC systems
  • Installation of earthing & lighting systems
  • Installation of cabling complete with cable raceway, termination, tagging 
  • Installation of AVR for transformers
  • Assistance in testing & commissioning.

 

 

 

 

 

 

 

 

KAHRAMAA
GTC/5/2004

Main contractor - SIEMENS

PHASE VI

12 substations

 

 

 

 

KAHRAMAA
GTC/53/2005

Main contractor - SIEMENS

 

 

 

 

 

 

KAHRAMAA
GTC/13/2003
Qatar Transmission System Expansion

Phase V

 

 

 

 

Al GHARAFA 132/66/11kV

 

 

 

 

 

 

18 Months

 

 

 

 

 

 

 

 

6 Months

 

 

 

 

 

 

 

3 Months

 

 

 

 

 

 

 

3 Months

 

 

 

 

 

 

 

QATAR

 

 

 

 

 

 

 

 

QATAR

 

 

 

 

 

 

 

QATAR

 

 

 

 

 

 

 

QATAR

 

 

 

 

 

 

 

Installation works & assistance in commissioning for the following substations:

1- PSS2 (66/11kV) Substation

  1. Installation of 40MVA power transformer complete with oil filtration process.
  2. Installation of 11kV switchgear
  3. Installation of protection system for 11kv
  4. Installation of SCS control systems
  5. Installation of LV/AC/DC systems
  6. Installation of earthing & lighting systems
  7. Installation of cabling complete with cable raceway, termination, tagging 
  8. Installation of AVR for transformers
  9. Assistance in testing & commissioning.

2- PSS5 (66/11kV) Substation

  1. Installation of 40MVA power transformer complete with oil filtration process.
  2. Installation of 11kV switchgear
  3. Installation of protection system for 11kv
  4. Installation of SCS control systems
  5. Installation of LV/AC/DC systems
  6. Installation of earthing & lighting systems
  7. Installation of cabling complete with cable raceway, termination, tagging 
  8. Installation of AVR for transformers
  9. Assistance in testing & commissioning

3-UMM SALAL (132/66/11kV) Substation

  1. Installation of 160MVA power transformers complete
  2. Installation of 66kV GIS.
  3. Installation of LCC for 66kV GIS
  4. Installation of protection system for 66kV
  5. Installation of 40MVA power transformer complete with oil filtration process.
  6. Installation of 11kV switchgear
  7. Installation of protection system for 11kv
  8. Installation of SCS control systems
  9. Installation of LV/AC/DC systems
  10. Installation of earthing & lighting systems
  11. Installation of cabling complete with cable raceway, termination, tagging 
  12. Installation of AVR for transformers
  13. Assistance in testing & commissioning.

4- OLD AIRPORT NORTH (66/11kV ) Substation

  1. Installation of 40MVA power transformer complete with oil filtration process.
  2. Installation of 11kV switchgear
  3. Installation of protection system for 11kv
  4. Installation of SCS control systems
  5. Installation of LV/AC/DC systems
  6. Installation of earthing & lighting systems
  7. Installation of cabling complete with cable raceway, termination, tagging 
  8. Installation of AVR for transformers
  9. Assistance in testing & commissioning.

 

 

5- WAKRAH CENTRAL (66/11kV) Substation

  1. Installation of 40MVA power transformer complete with oil filtration process.
  2. Installation of 11kV switchgear
  3. Installation of protection system for 11kv
  4. Installation of SCS control systems
  5. Installation of LV/AC/DC systems
  6. Installation of earthing & lighting systems
  7. Installation of cabling complete with cable raceway, termination, tagging 
  8. Installation of AVR for transformers
  9. Assistance in testing & commissioning.

 

6- KHORE EAST (66/11kV) Substation

  1. Installation of 40MVA power transformer complete with oil filtration process.
  2. Installation of 11kV switchgear
  3. Installation of protection system for 11kv
  4. Installation of SCS control systems
  5. Installation of LV/AC/DC systems
  6. Installation of earthing & lighting systems
  7. Installation of cabling complete with cable raceway, termination, tagging 
  8. Installation of AVR for transformers
  9. Assistance in testing & commissioning.

 

 

 

 

7- UMM SALAL ALI (66/11kV) Substation

  1. Installation of 66kV GIS.
  2. Installation of LCC for 66kV GIS
  3. Installation of protection system for 66kV
  4. Installation of 40MVA power transformer complete with oil filtration process.
  5. Installation of 11kV switchgear
  6. Installation of protection system for 11kv
  7. Installation of SCS control systems
  8. Installation of LV/AC/DC systems
  9. Installation of earthing & lighting systems
  10. Installation of cabling complete with cable raceway, termination, tagging 
  11. Installation of AVR for transformers
  12. Assistance in testing & commissioning.

 

8- MURRAH WEST (66/11kV) Substation

  1. Installation of 40MVA power transformer complete with oil filtration process.
  2. Installation of 11kV switchgear
  3. Installation of protection system for 11kv
  4. Installation of SCS control systems
  5. Installation of LV/AC/DC systems
  6. Installation of earthing & lighting systems
  7. Installation of cabling complete with cable raceway, termination, tagging 
  8. Installation of AVR for transformers
  9. Assistance in testing & commissioning.

9- WAKRA Substation
Replace of 132kV AIS equipment complete with the required change of cabling, protection system.

10- Doha North Super Substation
Modification on existing protection & control equipment, complete with requested cabling & earthing work.

11- Old Airport Substation
Modification on existing protection & control equipment, complete with requested cabling & earthing work.

12- KHORE North Substation
Cabling for existing bay B10 & Bay B20
Earthing works.
Modification on protection & control equipment.
Cable tray.

 

 

 

 

 

 

 

 


Installation works & assistance in commissioning for the following substations:
WEST BAY SUPER #2 220/66/11KV - SUBSTATION EQUIPMENT.

The works for the above substations include the following activities:
    1. 220kV GIS erection assistance to SIEMENS
    2. Installation of 11kV switchgear.
    3. Installation works for power transformers & shunt reactors
    4. Installation of earthing transformer
    5. Installation of Auxiliary transformer.
    6. Installation works of 220kV protection systems
    7. Installation works of 66kV protection systems
    8. Installation works of 11kV protection system
    9. Installation of earthing & lighting protection
    10. Installation power cable 220kV, 66kV and 11kV.

Electrical  Works – ABU HAMOUR North Substation
As subcontractor for VATECH:
    1. 220kV GIS erection assistance to VATECH
    2. Installation of 11kV switchgear.
    3. Installation works for power transformers & shunt reactors
    4. Installation of earthing transformer
    5. Installation of Auxiliary transformer.
    6. Installation works of 220kV protection systems
    7. Installation works of 66kV protection systems
    8. Installation works of 11kV protection system
    9. Installation of earthing & lighting protection
    10. Installation power cable 220kV, 66kV and 11kV.

 

Electrical works at Al GHARAFA Primary Substation as Subcontractor fro VATECH.
132kV equipment installation 3 Phase busbar disconnectors , CB, CT, 3 phase circuit disconnectors , CTV

  1. Installation of earthing & lighting system
  2. Installation of protection equipment
  3. Installation of SCADA System
    Installation of LV & control cables.

 

 

 

6 7   8
EMC Project Reference List

 

PROJECT NAME
CLIENT
YEAR
E.M.C. SCOPE OF WORK

APC/NMBIPS/146/STL/2007

Arab Potash Company

2008
Supply, Installation, testing and commissioning of 33kV Over Head Line for Power Supply of New Main Brine Intake Pumping Station at the Dead Sea (17Km).
APC/NMBIPS/146/STL/1/2007 Arab Potash Company
2008
Supply, Installation, testing and commissioning for Relocation of The Existing 33kV Township Over Head Line (9Km).

National Electric Power Company.
NEPCO 45/2005

Amman East 400kV Substation
CYMI- Spain

2007

2009

Electrical installation, assistance in testing and commissioning of 10 bay AIS 400KV substation equipment complete with the erection of steel works (gantries , outdoor equipment structure ) , busbar installation, outdoor, LCC, protection panels, DC system and indoor equipment and all the required earthing system as subcontractor for CYMI.
       

 

 

 

 

 
   
 

1.1. Electric Power Generation
(Supply, Install, and Testing & Commissioning): - Power Plant (Gas & Steam) install, testing and commission all associated power and Control equipments
-Diesel generating sets.
-Synchronizing panels and all associated power and Control equipment.       

Readmore

 
 

EMC presents comprehensive and specialized services in electricty sector from generation to distribution by the minds and hands of qualified engineers and technicaians in diffrenet sectors of electricity automation,control and protection power system, commuincation and recently security system.       
     

Readmore

 
 

EMC takes pride in being a leading regional supplier of diversified engineering equipment 
and services to the industrial and construction markets.
EMC has earned a reputation for being reliable and dependable as a result of its recognized
tack record of excellence.       

Readmore

 
2013 © Electro-Mechanical & Communication Engineers
Electro-Mechanical & Communication Engineers